You have no advanced search rows. Add one by clicking the '+ Add Row' button

Foel Goch Windfarm

Loading Map
NPRN413043
Map ReferenceSJ05NW
Grid ReferenceSJ0049056098
Unitary (Local) AuthorityDenbighshire
Old CountyDenbighshire
CommunityLlanrhaeadr-yng-nghinmeirch
Type Of SiteWIND FARM
Period21st Century
Description
The wind farm was constructed in 2005 together with Tir Mostyn Windfarm (NPRN 408313). The combined sites comprise 25 Gamesa G52 turbines. Each turbine has a maximum tip height of 75 metres resulting from a rotor hub diameter of 52 metres and the height to the hub being 49 metres.

Claire Parry, RCAHMW, 16 February 2011.

Source: www.ridgewind.com/projects/tir-mostyn-foel-goch